Every part of your landing gearrobotic leg has a maker. We find them all.

Our agents read the CAD, find makers for every part and run it to production as one project.

Welcome our newest suppliers

15,000+ suppliers mapped in 67 countries

The problem

One release. Hundreds of sourcing jobs.

  1. Released on MondayThe finished design and its drawings land with the buyer.
  2. Then it's sourced one part at a time107 parts. Every one made to your drawing is found, quoted and chased on its own.
  3. By email, with the five suppliers you knowHundreds of threads over the programme, and still chasing in week four.
  4. Or as one project24 made-to-drawing parts grouped onto 7 manufacturing routes, 83 bought in, matched and ready to send.

A 100-part programme means about 190 sourcing events over six years: first quotes, re-quotes at each revision, second sources and replacements (modelled).

Not a marketplace. Not another RFQ inbox.

4%

of manufacturers get from a specification to an accepted quote within a week. 70% still rely on email.

aPriori / IndustryWeek survey, n = 345 manufacturers, 2022.

  • Starts from your CAD assembly
  • Finds suppliers you don't already know
  • Gets the quotes and helps you award
  • Keeps production on track after the award

We’re never in the middle of your orders. You contract directly with the supplier.

Agents do the legwork. You make the calls.

Four agents work inside your PLM, ERP, email and chat. Anything that sends a request or commits money waits for you.

  • Drawing readerReads the CAD and drawings into a spec, with the source of every value.
  • Supplier finderNarrows thousands of makers to the few who can make it, with reasons.
  • Quote agentDrafts and sends the requests once you approve, then chases the replies.
  • Production watcherWatches every order against the build and brings you options early.
See every agent and where you approve

Try it on a robotic leg.

The Open-Source Leg: 107 parts, from the CAD to the build plan. It plays itself; click anything to take over.

Robotic leg · Rev C
Open-Source Leg v2.2 · coloured by how it’s made

Drawing reader · 107 parts and 26 drawings read

Volume: 5,000 legs a month for 4 years (240,000 legs)

About £4,392 per leg · £108 under target

  • Injection moulding8
  • Forging, CNC milling, Anodising6
  • CNC milling, Anodising4
  • CNC turning2
  • Forging, CNC milling, Heat treatment2
  • Extrusion, CNC milling1
  • Extrusion, CNC turning1
  • Bought-in parts83 · 32 lines

24 made to drawing · 83 bought in

Illustrative demo data

On a larger screen the demo plays itself, with the 3D model.

Join the waitlist

What it saves on your programme.

Your programme, over six years. Move the sliders.

Total saving over six years

£2.34m

6,976 hours back for buyers and engineers.

How it’s modelled

Modelled, not measured. Piece price assumes 3% lower landed cost on the annual spend. Time assumes 8,680 hours of sourcing and supplier management per 100-part programme over six years, cut to 1,704. Incidents assume two re-sourcing events a year per 100 parts at £10k each. We agree the baseline with each customer and measure against it.

Who are these suppliers, and can you trust them?

15,000+ suppliers mapped in 67 countries. Every one shows how far it has been checked.

How suppliers join and get verified

Who it's for.

Hardware teams

Source the release. Run it to production.

Join the waitlist

Suppliers

Get asked for work you can actually make.

Your profile is drafted for you. Requests arrive matched to your machines, certificates and capacity.

Free to join and quote

Claim your profile

Engineering consultancies

Running sourcing for clients? One project per client.

  • E-axle, client A2 quotes overdue
  • Turret drive, client BFirst article missing
  • Landing gear, client COn schedule

£0

We never take a cut of your orders.

You contract directly with the supplier. We’re never in the middle of your orders.

See it run on a real assembly.

A 30-minute walkthrough on a real assembly, from the CAD to a build plan.